![]() Check for cracks and crumbling.įor a concrete subfloor, you should install the plank with the sight lines of the floor. ![]() The concrete subfloor must be sufficiently strong to safely support the flooring, furniture, and people in the room. If moisture levels are not within the wood flooring manufacturer’s recommendations, You'll need to reduce the moisture and humidity in the area. If you have a subfloor that consists of wood on top of concrete, you’ll need to test both floors. Fill any low spots with a cementitious leveling compound following the manufacturer's directions and allow it to dry before proceeding.Ĭheck the moisture with a moisture test kit. ![]() Check your wood flooring manufacturer’s recommendations and sand any high spots with a concrete grinder. Typically, the floor must be level and uniform within 3/16 inch every 10 feet. Use a long level and tape measure to check that the floor is level. If you are installing a locking or floating floor not attached to the subfloor, just make sure that the subfloor is clean. As needed, use a concrete grinder (you may want to rent one) to remove any coating and to slightly roughen the concrete surface so the adhesive will stick. The surface can’t be slick, heavily troweled or burnished. If you are installing flooring with adhesive, clean the subfloor or old flooring of wax, paint, oil, sealers, adhesives and other debris following the adhesive manufacturer's instructions. ![]() Before you install, your subfloor must meet four requirements: clean, level, dry and structurally sound. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |